10th July 2014

9�t�h� �J�u�l�y�.� �I�f� �y�o�u� �l�o�o�k� �c�l�o�s�e�l�y� �y�o�u� �w�i�l�l� �s�e�e� �t�h�a�t� �t�h�e� �s�i�d�e� �w�a�l�l�s� �a�r�e� �n�o�w� �i�n� �p�l�a�c�e� �a�l�o�n�g� �w�i�t�h� �t�h�e� �r�o�o�f�,� �t�h�e� �r�o�l�l�e�r� �d�o�o�r�s� �a�r�e� �i�n�s�t�a�l�l�e�d�,� �t�r�a�c�k�w�o�r�k� �i�s� �i�n� �p�l�a�c�e� �f�o�r� �r�o�a�d�s� �2� �a�n�d� �4�.� �A� �s�t�a�r�t� �h�a�s� �b�e�e�n� �m�a�d�e� �o�n� �t�h�e� �w�a�l�l� �a�t� �t�h�e� �r�e�a�r� �o�f� �t�h�e� �s�h�e�d�.��� Swithland

9th July. If you look closely you will see that the side walls are now in place along with the roof, the roller doors are installed, trackwork is in place for roads 2 and 4. A start has been made on the wall at the rear of the shed.

© Tommy Lees


29th June 2014

V�i�e�w� �f�r�o�m� �t�h�e� �s�o�u�t�h� �e�n�d� �o�f� �t�h�e� �s�h�e�d� �a�s� �t�h�e� �c�l�a�d�d�i�n�g� �s�t�a�r�t�s� �t�o� �g�o� �o�n�.��� Swithland

View from the south end of the shed as the cladding starts to go on.

© Paul Harrison


24th May 2014 - Shed Update 2

Another view taken today of the shed, showing how rapid progress can be in just 24 hours.

© Tim Pryce


24th May 2014

With the perimeter and centre line foundations now completed the shed framework has started to go up. Rapid progress has already been made and in only three days around a quarter of the framework is already in position.

The steel erectors expect to have finished the framework by 6th June, we will then have a three week pause while the GCR start preparing the trackwork and we complete the foundations. We also need to create an access down the east side to allow the steel erectors to fit the cladding; this may be a volunteer activity for a Saturday in June.

The cladding and doors will be fitted to the framework from early July, so we should have a shed to move into by the end of July.

We still need to raise £7,000 to complete the building, so if you have been waiting until the shed started going up before donating now is the time to send your donation in. Details of how to donate can be found here.

© Darren Martin


© Darren Martin


15th May 2014

An update on where we are with the shed project, as we have suffered a few delays over the past couple of weeks, but now appear to have a clear plan forward.

The foundation work has taken longer than expected for various reasons; the foundations have had to go deeper than originally intended, the track work has had to be moved (twice) to give access, and (last week) large concrete slabs were found buried in the ground, which then had to be removed.

However we seem to be past all of the delays now, and concrete is being poured today (15th), Friday and next Tuesday to complete the ring beam and concrete pads – which is as far as we can go at this stage.

The shed supplier was due to start on site Tuesday past, but we’ve had to delay this by a week for the reasons above. They now intend to start on site next Tuesday (20th), although they will not be able to start in earnest until the following day (once the final foundation concrete has gone in). They intend to erect the framework, starting from the south end (where the concrete foundations are ready) and working north over the following few weeks.

A site meeting will take place next Tuesday as there are various activities that we need to co-ordinate – there is still the door threshold to be cast (which requires the track to be in place, which can’t go in until the shed frame is up), and there is the blockwork down the shed sides to go in – the builder will do this as the shed frame is erected. There may be some "challenges" to come here as access round the site once the shed starts going in will become increasingly difficult, but no major problems are foreseen at the moment.

The shed cladding will be installed once the steel framework is complete, hopefully a timeframe for this will become clearer after next Tuesday, but it looks hopeful we’ll see completion for the summer.

Finally, the track and points needs to be installed before we reach the stage that our historic collection of vehicles can go under cover.

As a result of the additional work we still need to raise several thousand pounds to complete the building this summer, so all donations will be gratefully received and should be sent to:

RVP (Shed)
26 Cliff Park Avenue
Wakefield
WF1 2DW

Please make cheques payable to RVP and write SHED on the reverse.

9th May 2014

T�h�i�s� �v�i�e�w� �o�f� �t�h�e� �s�h�e�d� �s�i�t�e� �w�a�s� �t�a�k�e�n� �o�n� �1�s�t� �M�a�y� �2�0�1�4� �a�n�d� �s�h�o�w�s� �t�h�e� �c�e�n�t�r�e� �l�i�n�e� �f�o�u�n�d�a�t�i�o�n�s� �c�o�m�p�l�e�t�e�,� �w�i�t�h� �t�h�e� �o�u�t�e�r� �f�o�u�n�d�a�t�i�o�n� �d�i�g�g�i�n�g� �v�i�s�i�b�l�e� �f�o�r� �c�o�n�c�r�e�t�i�n�g�.� �T�h�e� �t�r�a�c�k� �h�a�s� �b�e�e�n� �m�o�v�e�d� �a�g�a�i�n�,� �t�o� �a�l�l�o�w� �c�e�m�e�n�t� �l�o�r�r�y� �a�c�c�e�s�s� �f�o�r� �t�h�e� �o�u�t�e�r� �f�o�u�n�d�a�t�i�o�n�s� �t�o� �b�e� �c�a�s�t� �i�n� �o�n�e� �g�o�.� �T�h�e� �t�r�a�c�k� �i�s� �n�o�w� �i�n� �t�h�e� �f�i�n�a�l� �p�o�s�i�t�i�o�n�s� �o�f� �r�o�a�d�s� �2� �a�n�d� �3�.��� Shed Site

This view of the shed site was taken on 1st May 2014 and shows the centre line foundations complete, with the outer foundation digging visible for concreting. The track has been moved again, to allow cement lorry access for the outer foundations to be cast in one go. The track is now in the final positions of roads 2 and 3.

© Darren Martin


14th April 2014

1�2�t�h� �A�p�r�i�l� �a�n�d� �t�h�e� �c�e�n�t�r�e� �l�i�n�e� �f�o�u�n�d�a�t�i�o�n�s� �a�r�e� �a�l�m�o�s�t� �c�o�m�p�l�e�t�e�.��� Shed Foundations

12th April and the centre line foundations are almost complete.

© Paul Harrison


1�2�t�h� �A�p�r�i�l� �2�0�1�4� �a�n�d� �a�n�o�t�h�e�r� �v�i�e�w� �o�f� �t�h�e� �c�e�n�t�r�e� �l�i�n�e� �f�o�u�n�d�a�t�i�o�n�.��� Shed Foundations

12th April 2014 and another view of the centre line foundation.

© Paul Harrison


7th April 2014

C�o�n�c�r�e�t�e� �b�e�i�n�g� �p�o�u�r�e�d� �o�n� �t�h�e� �7�t�h� �M�a�r�c�h� �f�o�r� �t�h�e� �f�o�u�n�d�a�t�i�o�n�s�.��� Swithland

Concrete being poured on the 7th March for the foundations.

© John Reaney


5th April 2014

F�r�a�n�t�i�c� �a�c�t�i�v�i�t�y� �i�n� �t�h�e� �l�a�s�t� �w�e�e�k� �-� �a�n�d� �w�e� �n�o�w� �h�a�v�e� �a� �t�h�i�r�d� �o�f� �t�h�e� �f�o�u�n�d�a�t�i�o�n�s� �i�n� �p�l�a�c�e�.�
�
�
�
�T�h�e� �b�u�i�l�d�e�r�s� �h�a�v�e� �a�n�o�t�h�e�r� �w�e�e�k� �(�t�h�i�s� �w�e�e�k�)� �t�o� �d�o� �t�h�e� �r�e�m�a�i�n�i�n�g� �f�o�u�n�d�a�t�i�o�n� �h�o�l�e�s�,� �f�o�l�l�o�w�e�d� �b�y� �a� �w�e�e�k� �o�n� �t�h�e� �r�i�n�g� �b�e�a�m� �w�h�i�c�h� �c�i�r�c�l�e�s� �t�h�e� �e�n�t�i�r�e� �s�h�e�d� �(�t�h�e� �t�r�e�n�c�h� �f�o�r� �w�h�i�c�h� �h�a�s� �b�e�e�n� �h�a�l�f� �d�u�g� �a�s� �s�e�e�n� �i�n� �t�h�e� �p�h�o�t�o�)�.�T�h�e� �b�u�i�l�d�i�n�g� �i�n�s�p�e�c�t�o�r� �h�a�s� �m�a�d�e� �h�i�s� �f�i�r�s�t� �i�n�s�p�e�c�t�i�o�n� �v�i�s�i�t�,� �a�n�d� �i�s� �h�a�p�p�y� �w�i�t�h� �t�h�e� �f�o�u�n�d�a�t�i�o�n�s�.� �W�e� �t�h�e�r�e�f�o�r�e� �s�e�e� �n�o� �d�e�l�a�y�s� �i�n� �c�o�m�p�l�e�t�i�o�n� �o�f� �t�h�e� �f�o�u�n�d�a�t�i�o�n�s� �a�r�o�u�n�d� �E�a�s�t�e�r� �-� �w�i�t�h� �t�h�e� �s�h�e�d� �d�e�l�i�v�e�r�y� �d�u�e� �i�m�m�e�d�i�a�t�e�l�y� �a�f�t�e�r�w�a�r�d�s�,� �a�n�d� �e�r�e�c�t�i�o�n� �d�u�r�i�n�g� �M�a�y�.��� Swithland

Frantic activity in the last week - and we now have a third of the foundations in place. The builders have another week (this week) to do the remaining foundation holes, followed by a week on the ring beam which circles the entire shed (the trench for which has been half dug as seen in the photo).The building inspector has made his first inspection visit, and is happy with the foundations. We therefore see no delays in completion of the foundations around Easter - with the shed delivery due immediately afterwards, and erection during May.

© Darren Martin


31st March 2014

T�h�e� �r�e�m�a�i�n�i�n�g� �t�r�a�c�k� �h�a�s� �b�e�e�n� �d�i�s�c�o�n�n�e�c�t�e�d� �a�n�d� �m�o�v�e�d� �i�n� �t�h�e� �w�e�e�k� �l�e�a�d�i�n�g� �u�p� �t�o� �t�h�e� �3�1�s�t� �M�a�r�c�h� �2�0�1�4�.� �T�h�e� �t�w�o� �i�s�o�l�a�t�e�d� �s�t�r�e�t�c�h�e�s� �o�f� �t�r�a�c�k� �a�r�e� �o�n� �t�h�e� �f�i�n�a�l� �p�o�s�i�t�i�o�n�s� �f�o�r� �t�h�e� �f�i�r�s�t� �a�n�d� �t�h�i�r�d� �r�o�a�d�s�.� �T�h�e� �f�o�u�n�d�a�t�i�o�n� �h�o�l�e�s� �a�r�e� �m�a�r�k�e�d� �o�u�t� �i�n� �d�e�t�a�i�l� �o�n� �t�h�e� �l�e�f�t�.��� Swithland

The remaining track has been disconnected and moved in the week leading up to the 31st March 2014. The two isolated stretches of track are on the final positions for the first and third roads. The foundation holes are marked out in detail on the left.

© Darren Martin


2nd March 2014 - Shed site

A� �p�i�c�t�u�r�e� �o�f� �s�h�e�d� �s�i�t�e� �t�a�k�e�n� �o�n� �S�a�t�u�r�d�a�y� �1�s�t� �M�a�r�c�h�,� �w�i�t�h� �t�h�e� �s�h�e�d� �s�i�d�e� �n�o�w� �m�a�r�k�e�d� �o�u�t� �(�i�n� �b�l�u�e� �r�o�p�e�)� �-� �T�h�e� �t�w�o� �e�x�i�s�t�i�n�g� �s�i�d�i�n�g�s� �a�r�e� �r�o�u�g�h�l�y� �i�n� �t�h�e� �p�o�s�i�t�i�o�n� �o�f� �t�h�e� �f�i�r�s�t� �t�w�o� �r�o�a�d�s�,� �a�l�t�h�o�u�g�h� �t�h�e�s�e� �w�i�l�l� �b�e� �s�t�r�a�i�g�h�t�e�n�e�d� �a�t� �t�h�e� �e�n�d� �n�e�a�r�e�s�t� �t�h�e� �c�a�m�e�r�a�.��� Shed site

A picture of shed site taken on Saturday 1st March, with the shed side now marked out (in blue rope) - The two existing sidings are roughly in the position of the first two roads, although these will be straightened at the end nearest the camera.

© Darren Martin


1st March 2014 - THE SHED ORDER HAS BEEN PLACED!

These are exciting times for RVP, and a short intense burst of activity in the next few weeks should give us much better control over our own future. The board have taken a (carefully considered) risk in placing the shed order now. We have raised enough funding to cover the costs, but it does mean that, in the short term, we need to use all of our financial reserves to allow it to go ahead. However the shed supplier was able to hold the price we’d been quoted 18 months earlier, but it would be unrealistic to expect them to do so for much longer so there was some urgency to order now. The board are confident that the level of support we’ve seen to date can be maintained to ensure we come out of the other end with some money in the bank – but over to you to prove us right in that belief!

Since the launch of the appeal in April 2013 we have raised over £100,000. This is a magnificent result which many bigger organisations would be extremely proud of. To this RVP’s board agreed to add £40,000 from our reserves (effectively held from the sale of steam loco 7597 some years ago), and we had already spent the £10,000 in planning and design from our general funds. Add this together and you can see we had a total of £150,000. Or, to put it more simply – not enough!

This is the dilemma that faced us, but in the short term we are able to "borrow" other reserves held to cover the shortfall. But we MUST RAISE THE REMAINING £17,000 or so in the next two months. I cannot stress enough how important this period is to ensure that, once we have a shed, we are able to carry on restoring the things in it!

I hope you can see that we are getting excellent value for money by going ahead now, and that the financial risk is manageable. We are delighted with the support received to date and we clearly have a duty to build the shed we have promised. This will be done and if you’ve been waiting to see that we actually could do it before helping us out the next few weeks should set your minds at rest!

To get us this far has required a huge amount of effort behind the scenes. We must thank Tony Sparks for doing the planning, design and building regulations aspects. We simply would not have been able to do this without his knowledge and experience. Thanks also to Paul Harrison for his work in keeping the project moving, and to all who have donated or contributed in some way. Finally our thanks to the GCR (and in particular Bill Ford, Alan Brassey and Graham Bannister) for their help to reach agreements for the use of the site and the subsequent clearance of it.

At the time of writing there is much still to do. Even when the shed structure is built the project is far from complete (we’ll have a basic shed, but with loads of scope for improvement!). Nevertheless the project is well and truly underway, so a few more details of what we are getting……

THE SHED – The final drawing for the shed front is shown below. The shed is double pitch, four road, with four roller shutter doors. Length of the shed is 65m with space for three coaches on each road (perhaps more as some of our stock is not on long underframes). We have 13 wooden bodied coaches, so if we assume one will always be at Rothley for major work, thats all of them kept under cover (with some scope for also accommodating the odd Mk1 TPO vehicle as necessary if any of them need it). It is intended to fit a central wall to provide a measure of fire protection in the event of a problem in one half of the shed.

Shed front

Internally the shed will initially be very basically fitted out. The floor will simply be ash (and the track). No internal cladding (except of boundary side wall where this is a building regulation requirement). Generator powered lighting is expected to follow construction. This is to keep the construction cost to a minimum and get our collection under cover as quickly as possible. There will be plenty of scope for improving the shed over time, and the appeal is likely to remain open to allow us to do so.

THE TRACKWORK – As part of the agreement with the GCR, they will provide the trackwork into the shed. This is currently being designed and it is likely that this initially will connect the three roads nearest to the GCR main line to the rest of Swithland yard. The fourth road (on the boundary) is likely to be isolated track for the time being (there are some costly constraints on the access to this road to be completed at a later date). This isolated track will hold three of our stored vehicles for the time being; likely to be the two Gresley BTKs (57451 and 62565) and the Flying Scotsman composite (18033).

There is clearly a lot of work to do on the track, and this is starting now with a comprehensive levelling survey to allow the approaches to be levelled and the track design finalised. We are grateful to the GCR for their assistance here.

SHED OPERATION – The shed is essentially for storage. Under the terms of the planning consent we are able to do light maintenance work there (e.g. cleaning, and some minor running repairs), but it can’t be used as a workshop (we’ll continue to use Rothley as now). Initially one road will have our serviceable passenger coaches on it (the teak pigeon van, Gresley RB, and Beavertail); these will continue to be used by the GCR as now, but will be stored at the shed between periods of use. Further space will hold the LNER TPO set (sorter, tender, BZ, and motorail van) – these remain basically serviceable and can be moved to Quorn (or elsewhere) for display as required. We then have our “works in progress” – vehicles 23981 9116 and the Ambulance Van currently, which can reside in the shed during pauses in their restoration. This will make a massive difference in being able to put partly restored vehicles under cover when other priorities mean space is needed at Rothley. Then there are the long term stored vehicles mentioned above. Finally we have the second Beavertail currently hidden away – but its major restoration will conclude in due course and it is intended it will live in the shed between periods of use (perhaps on the GCR and elsewhere).

Over time the number of restored coaches will increase and the stored vehicles reduce; the shed becoming more of a “running shed” for the GCR’s collection of historic vehicles. Initially there is no intention to open the shed to the public. However the possibility remains of limited access during those events when the GCR open Swithland yard, and we can, of course, arrange access for anyone particularly interested in any of our vehicles (this being much easier to do with the vehicles stabled in a relatively safe location as opposed to any one of a number of sidings on the GCR).

13th January 2014 - 'A shed full of coaches'

Railway Vehicle Preservations are getting closer to the day that it can reported that "All our historic wooden bodied coaches are under cover". We "only" need to raise another £20,000 within the next few months to be able to place the order for the shed, to be built at Swithland Sidings on the Great Central Railway.

Planning permission is in place, building regulations have been approved and the order for the foundation work has been placed. The foundations are due to be installed in March and be should be completed in April, subject to the weather. The response to the latest appeal in the Great Central Railway’s "Main Line" magazine was superb and has raised around £10,000. This along with other donations means that we are now within £20,000 of being able to place the order for the shed. If we can raise this money before the foundations are completed then the shed could be built and ready for occupation by the summer - we really do need every donation to be able to get the job done!

To be able to get all the restored and unrestored vehicles undercover will enable us to make inroads into the renovation of the vehicles that still await their turn in the restoration queue, while ensuring that those already restored do not deteriorate due to being out in the open at the perils of the British elements.

RVP has one of the most historic collections of LNER vehicles; both Beavertails from the 1937 "Coronation" train, the only surviving coach built for the "Flying Scotsman" train of 1924, the only restored six wheeled Thompson brake coach, the sole surviving LNER bogie CCT and not forgetting the only surviving LNER Travelling Post Office set amongst others. Now is the time to make this the last winter that these historic vehicles have to endure the elements.

All donations, with cheques made payable to Railway Vehicle Preservations Ltd, should be sent to:

RVP (Shed),
26 Cliff Park Avenue,
Wakefield,
WF1 2DW